Skip to content

Asbestos Remediation in Chandler, AZ

Chandler built a lot of housing before the rules changed. If yours predates 1985, test before you renovate.

Why the build date matters

Chandler and the wider East Valley put up homes steadily from the 1940s through the 1980s. Asbestos was standard in building materials for most of that stretch.

Material in good condition and left alone is usually not the problem. Renovation and deterioration are.

A Vizcom Contracting team member beside a kitchen doorway sealed in plastic and posted with bilingual asbestos danger signs.

The floor tile problem

Vinyl floor tile and the black mastic under it are the most common find in Chandler homes built before 1980. Both can contain asbestos.

Normal removal methods grind and snap that material, which is exactly how fibers get into a living room.

Inspection and lab work

A certified inspector walks the property, logs every suspect material and collects samples under protocol.

The lab result decides the scope. You see the written report before you approve anything.

Call (623) 225-7898
  • Popcorn and textured ceilings
  • Floor tile and adhesive
  • Attic and duct insulation
  • Pipe wrap
  • Roofing felt and shingles

Removal under containment

The work area gets sealed and put under negative pressure before anything is disturbed. Material comes out wet to hold fibers down.

Waste is double bagged, labeled and hauled to an approved disposal site by a licensed carrier.

A sealed asbestos containment set up by Vizcom Contracting inside a Phoenix property.

Notices, clearance and records

The county wants notice ten business days before this work starts. On a remodel the amount is what triggers it. The limits are 160 square feet, 260 linear feet or 35 cubic feet.

We measure the scope, then file. An outside hygienist tests the air before the containment comes down. You keep the whole file.

  • EPA Certified Firm
  • IICRC Certified
  • ROC #315042
  • TRI Certified

Frequently asked questions

The questions owners ask us first, answered before you call.

Before a renovation that disturbs building materials, yes. Housing here went up steadily from the 1940s through the 1980s, and asbestos was standard for most of that period. Nobody can identify it by eye, so a certified inspector samples the material and a lab reads it.

That is the single most common way fibers get into a Chandler living room. Both the tile and the black mastic under it can contain asbestos, and standard removal methods snap and grind the material. Test it first, and if it is positive, it comes out under containment.

Ten business days before the work starts. We prepare the notice and file it. The confirmation goes in your project file.

160 square feet, 260 linear feet or 35 cubic feet of asbestos material. We measure your scope against those limits up front. The filing never holds up your remodel.

An independent industrial hygienist, not us. They sample the air while the containment is still sealed, and that result is what reopens the room. You keep the clearance certificate along with the lab results and the disposal manifests.

Yes, and it usually saves a month. We are an EPA Certified Firm and hold the builder license. So the survey, the removal and the rebuild run on one schedule.

Still have a question?

(623) 225-7898

Get your free inspection

Tell us what happened. We’ll call you back with a plan and a time we can be there.

No obligationFree inspection

Damage active right now? Call (623) 225-7898.