
Asbestos Remediation in Scottsdale, AZ
Plenty of Scottsdale buildings still hold asbestos. Left alone it sits there. Renovation is what wakes it up.
A building boom before the rules

Scottsdale and the wider Phoenix metro grew hard through the 1950s, 1960s and 1970s. Asbestos was a normal building material for all of it.
Thousands of properties here still contain it, and most owners have no reason to know.
- Popcorn ceilings
- Floor tile adhesive
- Pipe insulation
- Roofing shingles
- Drywall joint compound
Intact is not the same as safe
Undisturbed material in good condition carries limited risk. Damage, decay or a demolition crew changes that immediately.
Fibers released into the air are the hazard, and they are far too small to see.
Testing settles it
A certified inspector samples the suspect materials and a laboratory identifies what is actually in them.
That report tells you whether you have a project or a false alarm, before anyone quotes a removal.

The county filing that sets your start date
The county needs notice ten business days before this work starts. On a Scottsdale remodel that wait is often the real start date.
On a remodel the amount decides it. The limits are 160 square feet, 260 linear feet or 35 cubic feet. A full teardown needs the notice either way.
Abatement to federal and state rules
Certified technicians run the removal under sealed containment, following Arizona and EPA requirements.
Waste is bagged, labeled, manifested and taken to an approved facility.
Air clearance before reoccupancy
An independent hygienist tests the air while containment is still up. Passing that test is what clears the space.
You keep the inspection report, the lab results, the manifests and the clearance certificate.
- EPA Certified Firm
- IICRC Certified
- ROC #315042
- TRI Certified
More of our work in Scottsdale
One phone number reaches every city we serve.
Frequently asked questions
The questions owners ask us first, answered before you call.
It depends almost entirely on the build date. The metro grew hard through the 1950s, 1960s and 1970s, and asbestos was a normal building material for all of it. Thousands of properties here still contain it in ceilings, floor tile adhesive, pipe insulation and roofing.
Often yes. Sound material that nobody touches carries limited risk, and sealing it is sometimes the right call. The danger is loose fibers in the air, not the material sitting in place.
The notice has to be in ten business days before work starts. That wait is usually the real start date. We file as soon as the lab result is back, so the clock runs during planning.
On a remodel, 160 square feet, 260 linear feet or 35 cubic feet. A full teardown needs the notice at any amount. It is due even with no asbestos at all.
The inspection report, the lab results, the disposal records and the air clearance certificate. A buyer, a lender or the next contractor will ask for that package. Keep it with the property file.
Yes. We hold the builder license as well as the EPA one, so removal and rebuild sit on one contract. The abatement gets scheduled around your build, not the other way round.
Still have a question?
(623) 225-7898
Get your free inspection
Tell us what happened. We’ll call you back with a plan and a time we can be there.
Damage active right now? Call (623) 225-7898.